Date of project: 2014
Key objectives: STOP OIL LEAK ON BOW THRUSTER
Project location: NORTH SEA
Key barriers/issues: Remote installation guidance required
Key achievements: Oil leak reduced from 14L/day to 0L/day

Project description

AtZ Marine was asked to resolve a 14 litre/day oil leak from a TV150 bow thruster on the Gargano, a North Sea offshore support vessel. After analysing the system drawings and information about the leakage, AtZ Marine dispatched 60L of ABCON® thruster stop leak product the same day for delivery to Gt. Yarmouth. The crew added the ABCON® with remote assistance from AtZ Marine and the leakage reduced to zero within 24 hours. The vessel continued normal operations until its planned docking in mid 2015.

Talk to our team of technical experts

Our team of technical experts offer industry-leading consultation services, equipment sales and support and with a wealth of project management and technical experience, we plan and deliver. We work with you to ensure a smooth project from design specification to onsite installation. Our impartial guidance and multi-supplier approach mean we are focused on finding you the best solution meaning you can be confident in both our services and products.

Talk to us today Download Brochure