Date of project: 2009
Key objectives: On time commissioning
Project location: DUBAI
Key barriers/issues: TIME
Key achievements: On time delivery and successful operation

Project description

The project we were asked to advise on was to convert two of the world’s biggest tankers into floating storage offshore units, FSO’s with capability to remove drill water and return in clean condition to the drilling rigs. AtZ Marine was asked to provide 3 Zone II hazardous area oil-in-water monitoring devices for location in the pump room. We designed, installed and commissioned 2 Deckma Hamburg OMD-7MKII air purged cabinets for measuring oil in water in the produced water and 1 Deckma Hamburg OMD-17A for measuring oil-in-water in the voc overboard line.  AtZ also provided dedicated service support and annual calibration and system safety checks for the equipment.

Talk to our team of technical experts

Our team of technical experts offer industry-leading consultation services, equipment sales and support and with a wealth of project management and technical experience, we plan and deliver. We work with you to ensure a smooth project from design specification to onsite installation. Our impartial guidance and multi-supplier approach mean we are focused on finding you the best solution meaning you can be confident in both our services and products.

Talk to us today Download Brochure
Top